Week 102 — Cost/safety/caching
Production AI platform engineering · Implement
Hard
Phase 9 — Production AI platform engineering
Overview
Semantic/embedding cache, injection detection, cost attribution
Mode this week: implement. Match the work to that mode (operating model): implement ships running code; read/diagram ships a doc; deploy/benchmark ships a measured run. Personal dates, checkboxes, and the RPG layer stay in a learner journal.
Core deliverable
Cost/safety platform
- Gate 9 this week: Working production AI platform: router, quotas, tracing, logging, idempotency, work queue, model registry, cost attribution, safety filters
Optional depth
Add a production-shaped benchmark, cost or safety analysis, and an architecture trade-off note.
Week loop (from the cookiecutter journal)
- Mon — Theory: Semantic/embedding cache, injection detection, cost attribution
- Tue — Build: start the core deliverable above
- Wed — Systems / papers: one paper or system note (see below if this week has assigned reading)
- Thu — Eval / interview: write the four evidence items
- Fri — Algorithmic Forge: Euler Tour plus DSU-on-Tree subtree analytics, used as preparation for Capstone 2. (2-3 hr; Boss fight)
Forge theme: Week 102 - Platform tree boss
Leetcode Darbar (parallel)
This week's band (82-102): Heaps, priority queues, graphs, trees, range queries. Production connection: Inference schedulers, quotas, queues, tenant fairness.
Standard: one aligned problem. Auror: the five-slot queue on the Darbar page. Tracker stays in the learner journal.
Topics: graphs · heap · queue · range query · trees
- All Paths From Source To Target · medium · graphs
- The K Weakest Rows In A Matrix · easy · heap
- Implement Stack Using Queues · easy · queue
- Queue Reconstruction By Height · medium · range query
- Binary Tree Paths · easy · trees
Evidence contract
Every core week records all four (cookiecutter journal/weeks/week_102.md):
- Code / implementation (or the design artifact on a writing week)
- Benchmark / result
- Design doc / technical explanation
- Retrospective / learning note (Sailboat: destination, wind, anchor, rocks, heading)
On this site
Official Tensor-to-Tenant
- Curriculum browser
- Milestone gates
- Weekly operating model
- Leetcode Darbar
- 36-week on-ramp
- Source repo
Week 102 of Tensor-to-Tenant · Previous week · Next week.