Week 55 — Case studies III
System design and distributed systems fundamentals · Read / diagram
Medium
Phase 5 — System design and distributed systems fundamentals
Overview
WhatsApp, LeetCode
Mode this week: read_diagram. Match the work to that mode (operating model): implement ships running code; read/diagram ships a doc; deploy/benchmark ships a measured run. Personal dates, checkboxes, and the RPG layer stay in a learner journal.
Core deliverable
Two design docs
Optional depth
Add a benchmark, failure-mode analysis, and a short production trade-off note.
Week loop (from the cookiecutter journal)
- Mon — Theory: WhatsApp, LeetCode
- Tue — Build: start the core deliverable above
- Wed — Systems / papers: one paper or system note (see below if this week has assigned reading)
- Thu — Eval / interview: write the four evidence items
- Fri — Algorithmic Forge: Resource-allocation design; Week 57 graph boss fight (45-120 min; Core / Supporting)
Forge theme: MST, Euler paths, max flow, min-cost flow, matching
Leetcode Darbar (parallel)
This week's band (46-57): Graphs, trees, greedy, DSU, range queries. Production connection: System design, workflows, sharding, scheduling.
Standard: one aligned problem. Auror: the five-slot queue on the Darbar page. Tracker stays in the learner journal.
Topics: graphs · greedy · range query · trees
- All Paths From Source To Target · medium · graphs
- Longest Palindrome · easy · greedy
- Queue Reconstruction By Height · medium · range query
- Binary Tree Paths · easy · trees
Evidence contract
Every core week records all four (cookiecutter journal/weeks/week_055.md):
- Code / implementation (or the design artifact on a writing week)
- Benchmark / result
- Design doc / technical explanation
- Retrospective / learning note (Sailboat: destination, wind, anchor, rocks, heading)
On this site
Official Tensor-to-Tenant
- Curriculum browser
- Milestone gates
- Weekly operating model
- Leetcode Darbar
- 36-week on-ramp
- Source repo
Week 55 of Tensor-to-Tenant · Previous week · Next week.